VT / Williston
VT · EV charging
EV charging in Williston, VT
Here is what NREL's public data shows about EV charging in Williston, VT. As of NREL AFDC data retrieved July 2026, Williston has 11 public charging stations with 15 Level 2 ports, including 10 DC fast-charging ports for quick top-ups.
DC fast Level 2 not recently confirmed · click a marker for details, directions & Street View
- 11Public stations
- 15Level 2 ports
- 10DC fast ports
- 40%Ports that are DC fast
⚡ 1 station lists free charging
Stations are operated across 6 networks: ChargePoint Network (6), Non-networked (1), Tesla (1), VIALYNK (1), and 2 more.
Connectors on record: J1772 (Level 2) at 8 stations; CHAdeMO at 2 stations; CCS (J1772 Combo) at 2 stations; NACS / Tesla at 1 station.
Of these stations, 1 list free charging and 1 are paid, per NREL's pricing field. Pricing is not recorded for the remaining 9. Always confirm current pricing with the network before you charge.
1 station carries a NACS / Tesla connector — relevant if you drive a Tesla or a newer EV that has switched to NACS.
Notable charging stations
The largest sites by port count, DC fast first. Williston has 11 public stations in all — see the map above.
| Station | Network | Charging | Confirmed |
|---|---|---|---|
| Williston, VT - Tesla Supercharger 31 Market Street | Tesla | DC fast 8 DC fast · NACS / Tesla | June 2026 |
| BERLIN CITY KIA STATION 1 586 Marshall Ave | ChargePoint Network | DC fast 1 DC fast · CHAdeMO, CCS (J1772 Combo) | July 2026 |
| Green Mountain Power - Williston Hannaford 78 Marshall Ave | FLO | DC fast 1 DC fast · CHAdeMO, CCS (J1772 Combo) | July 2026 |
| HOME2 WILLISTON MARKET 2 150 Market St | ChargePoint Network | 2 Level 2 · J1772 (Level 2) | July 2026 |
| HOME2 WILLISTON MARKET 1 150 Market St | ChargePoint Network | 2 Level 2 · J1772 (Level 2) | July 2026 |
| UNION BANK UNB MARKET ST 31 Market St | ChargePoint Network | 2 Level 2 · J1772 (Level 2) | July 2026 |
| Hannaford Williston 78 Marshall Ave | VIALYNK | 2 Level 2 · J1772 (Level 2) | July 2026 |
| Vermont Hotel Group (La Quinta Inn & Suites by Wyndham Williston/Burlington) 36 Blair Park Rd | LOOP | 2 Level 2 · J1772 (Level 2) | July 2026 |
| TCE AQ WIL TCE-BOWMAN-VT 478 Blair Park Rd | ChargePoint Network | 2 Level 2 · J1772 (Level 2) | July 2026 |
| HOLLAND TPS2 281 Holland Lane | ChargePoint Network | 2 Level 2 · J1772 (Level 2) | July 2026 |
Spotted something out of date or missing? Report a correction.
What this means
Level 2 is the standard public and home charger (240V) — a few hours for a full charge, fine for shopping, work, or overnight. DC fast charging is the highway kind: 20–40 minutes to most of a charge, but not every station has it.
Connectors are the plug shape. J1772 is the universal Level 2 plug almost every non-Tesla EV uses. CCS and CHAdeMO are DC fast-charging plugs (CHAdeMO is older, mostly older Nissan Leafs). NACS is Tesla's plug, now the emerging US standard — many newer non-Teslas use it or an adapter.
This page summarizes NREL's own station records and is not a live availability map — a charger listed here can still be busy, broken, or behind a gate. Check the network's app before you rely on a specific plug.
Charging at home in Williston?
Most EV owners do the bulk of their charging overnight at home on a Level 2 charger. See our home EV charger buying guide for what to look for and how to match a charger to your car's connector.
EV charging near Williston
Source: U.S. DOE / NREL Alternative Fuels Data Center (AFDC) Station Locator, retrieved July 2026. Public stations only.