WI / Manitowoc
WI · EV charging
EV charging in Manitowoc, WI
Here is what NREL's public data shows about EV charging in Manitowoc, WI. As of NREL AFDC data retrieved November 2026, Manitowoc has 5 public charging stations with 5 Level 2 ports, including 10 DC fast-charging ports for quick top-ups.
DC fast Level 2 not recently confirmed · click a marker for details, directions & Street View
- 5Public stations
- 5Level 2 ports
- 10DC fast ports
- 67%Ports that are DC fast
Stations are operated across 3 networks: ChargePoint Network (3), Tesla (1), Non-networked (1).
Connectors on record: J1772 (Level 2) at 3 stations; NACS / Tesla at 1 station; CCS (J1772 Combo) at 1 station.
1 station carries a NACS / Tesla connector — relevant if you drive a Tesla or a newer EV that has switched to NACS.
How Manitowoc compares
- 1.4 public stations per 10,000 residents — about the Wisconsin rate (1.5).
- 2.9 DC fast ports per 10,000 residents — 1.7× the Wisconsin rate (1.7).
Who runs Manitowoc's DC fast charging
| Network | DC fast ports | Share |
|---|---|---|
| Tesla | 8 | 80% |
| Non-networked | 2 | 20% |
Last verified: NREL confirmed 100% of Manitowoc's stations in the 12 months before this snapshot, most recently in November 2026.
Population: U.S. Census Bureau, Vintage 2024 population estimates (34,616 residents; Wisconsin 5,960,975). Station counts use NREL's address city, which can extend past city limits, so rates are approximate.
Notable charging stations
The largest sites by port count, DC fast first. Manitowoc has 5 public stations in all — see the map above.
| Station | Network | Charging | Confirmed |
|---|---|---|---|
| Manitowoc, WI - Tesla Supercharger 2151 S 42nd St | Tesla | DC fast 8 DC fast · NACS / Tesla | June 2026 |
| Van Horn Dodge - Manitowoc 4611 Expo Dr | Non-networked | DC fast 2 DC fast · CCS (J1772 Combo) | November 2026 |
| MANITOWOC MANTY_LIBRARY 821 S 8th St | ChargePoint Network | 2 Level 2 · J1772 (Level 2) | November 2026 |
| RIVER NORTH APT RIVER NORTH 1000 River Point Drive | ChargePoint Network | 2 Level 2 · J1772 (Level 2) | November 2026 |
| WOODLAND DUNES WOODLAND DUNES 3304 WI-310 | ChargePoint Network | 1 Level 2 · J1772 (Level 2) | November 2026 |
Spotted something out of date or missing? Report a correction.
What this means
Level 2 is the standard public and home charger (240V) — a few hours for a full charge, fine for shopping, work, or overnight. DC fast charging is the highway kind: 20–40 minutes to most of a charge, but not every station has it.
Connectors are the plug shape. J1772 is the universal Level 2 plug almost every non-Tesla EV uses. CCS and CHAdeMO are DC fast-charging plugs (CHAdeMO is older, mostly older Nissan Leafs). NACS is Tesla's plug, now the emerging US standard — many newer non-Teslas use it or an adapter.
This page summarizes NREL's own station records and is not a live availability map — a charger listed here can still be busy, broken, or behind a gate. Check the network's app before you rely on a specific plug.
Charging at home in Manitowoc?
Most EV owners do the bulk of their charging overnight at home on a Level 2 charger. See our home EV charger buying guide for what to look for and how to match a charger to your car's connector.
EV charging near Manitowoc
Source: U.S. DOE / NREL Alternative Fuels Data Center (AFDC) Station Locator, retrieved November 2026. Public stations only.