ChargingAtlas

CO / Englewood

CO · EV charging

EV charging in Englewood, CO

Here is what NREL's public data shows about EV charging in Englewood, CO. As of NREL AFDC data retrieved November 2026, Englewood has 30 public charging stations with 104 Level 2 ports, including 23 DC fast-charging ports for quick top-ups.

DC fast   Level 2   not recently confirmed  ·  click a marker for details, directions & Street View

⚡ 5 stations list free charging

Stations are operated across 7 networks: Blink Network (14), ChargePoint Network (8), Tesla Destination (3), Electrify America (2), and 3 more.

Connectors on record: J1772 (Level 2) at 25 stations; CCS (J1772 Combo) at 5 stations; NACS / Tesla at 4 stations; CHAdeMO at 2 stations.

Of these stations, 5 list free charging and 1 are paid, per NREL's pricing field. Pricing is not recorded for the remaining 24. Always confirm current pricing with the network before you charge.

4 stations carry a NACS / Tesla connector — relevant if you drive a Tesla or a newer EV that has switched to NACS.

How Englewood compares

Who runs Englewood's DC fast charging

Network DC fast ports Share
Rivian Adventure Network 12 52%
Electrify America 7 30%
Blink Network 2 9%
ChargePoint Network 2 9%

Last verified: NREL confirmed 100% of Englewood's stations in the 12 months before this snapshot, most recently in November 2026.

Population: U.S. Census Bureau, Vintage 2024 population estimates (35,238 residents; Colorado 5,957,493). Station counts use NREL's address city, which can extend past city limits, so rates are approximate.

Notable charging stations

The largest sites by port count, DC fast first. Englewood has 30 public stations in all — see the map above.

StationNetworkChargingConfirmed
Centennial, CO
9535 East County Line Road
Rivian Adventure Network DC fast 12 DC fast · NACS / Tesla November 2026
Kroger King Soopers 65 (Englewood, CO)
101 Englewood Pkwy
Electrify America DC fast 4 DC fast · CCS (J1772 Combo) November 2026
Target T0147 (Englewood, CO)
6767 S. Clinton St.
Electrify America DC fast 3 DC fast + 1 Level 2 · J1772 (Level 2), CCS (J1772 Combo) November 2026
Englewood Recreation Center-
1155 West Oxford Avenue
Blink Network DC fast 2 DC fast · CCS (J1772 Combo) November 2026
GROOVESUBARU GS CUSTOMER 1
5300 South Broadway
ChargePoint Network DC fast 1 DC fast · CHAdeMO, CCS (J1772 Combo) November 2026
GROOVESUBARU GS CUSTOMER 2
5300 South Broadway
ChargePoint Network DC fast 1 DC fast · CHAdeMO, CCS (J1772 Combo) November 2026
AMLI Dry Creek
7471 S Clinton St
Loop 20 Level 2 · J1772 (Level 2) October 2026
Emerson Apartments
3444 South Emerson Street
Blink Network 8 Level 2 · J1772 (Level 2) November 2026
Noble Englewood Apartments
1375 East Hampden Avenue
Blink Network 6 Level 2 · J1772 (Level 2) November 2026
Hotel Inverness Denver - Tesla Destination
200 Inverness Dr W
Tesla Destination 6 Level 2 · J1772 (Level 2), NACS / Tesla August 2026

Spotted something out of date or missing? Report a correction.

What this means

Level 2 is the standard public and home charger (240V) — a few hours for a full charge, fine for shopping, work, or overnight. DC fast charging is the highway kind: 20–40 minutes to most of a charge, but not every station has it.

Connectors are the plug shape. J1772 is the universal Level 2 plug almost every non-Tesla EV uses. CCS and CHAdeMO are DC fast-charging plugs (CHAdeMO is older, mostly older Nissan Leafs). NACS is Tesla's plug, now the emerging US standard — many newer non-Teslas use it or an adapter.

This page summarizes NREL's own station records and is not a live availability map — a charger listed here can still be busy, broken, or behind a gate. Check the network's app before you rely on a specific plug.

Charging at home in Englewood?

Most EV owners do the bulk of their charging overnight at home on a Level 2 charger. See our home EV charger buying guide for what to look for and how to match a charger to your car's connector.

EV charging near Englewood

Source: U.S. DOE / NREL Alternative Fuels Data Center (AFDC) Station Locator, retrieved November 2026. Public stations only.