CO / Littleton
CO · EV charging
EV charging in Littleton, CO
Here is what NREL's public data shows about EV charging in Littleton, CO. As of NREL AFDC data retrieved July 2026, Littleton has 47 public charging stations with 138 Level 2 ports, including 19 DC fast-charging ports for quick top-ups.
DC fast Level 2 not recently confirmed · click a marker for details, directions & Street View
- 47Public stations
- 138Level 2 ports
- 19DC fast ports
- 12%Ports that are DC fast
Stations are operated across 10 networks: ChargePoint Network (31), Blink Network (5), Electrify America (2), eVgo Network (2), and 6 more.
Connectors on record: J1772 (Level 2) at 43 stations; CCS (J1772 Combo) at 6 stations; CHAdeMO at 4 stations.
Of these stations, 4 are paid, per NREL's pricing field. Pricing is not recorded for the remaining 43. Always confirm current pricing with the network before you charge.
Notable charging stations
The largest sites by port count, DC fast first. Littleton has 47 public stations in all — see the map above.
| Station | Network | Charging | Confirmed |
|---|---|---|---|
| Columbine Knolls Village (Littleton, CO) 8156 S Wadsworth Blvd | Electrify America | DC fast 6 DC fast · CCS (J1772 Combo) | July 2026 |
| Chanson Plaza 8086 W Bowles Ave | eVgo Network | DC fast 4 DC fast · CHAdeMO, CCS (J1772 Combo) | July 2026 |
| Littleton Square 100 W Littleton Blvd | eVgo Network | DC fast 4 DC fast · CHAdeMO, CCS (J1772 Combo) | July 2026 |
| Walmart 5049 (Littleton, CO) 13420 W. Coal Mine Ave. | Electrify America | DC fast 3 DC fast + 1 Level 2 · CHAdeMO, J1772 (Level 2), CCS (J1772 Combo) | July 2026 |
| Courtesy Motor Company. 7590 South Broadway | Blink Network | DC fast 1 DC fast + 2 Level 2 · J1772 (Level 2), CCS (J1772 Combo) | July 2026 |
| Empire Littleton Nissan 5067 S Wadsworth Blvd | IN_CHARGE | DC fast 1 DC fast · CHAdeMO, CCS (J1772 Combo) | January 2026 |
| AMLI Littleton Village 399 E Dry Creek Rd | LOOP | 38 Level 2 · J1772 (Level 2) | July 2026 |
| Windermere Apartments 5529 South Windermere Street | Blink Network | 8 Level 2 · J1772 (Level 2) | July 2026 |
| Weston Ridge Apartments 5967 South Gallup Street | Blink Network | 7 Level 2 · J1772 (Level 2) | July 2026 |
| Behavior Analyst Certification Board 7950 Shaffer Pkwy | Non-networked | 4 Level 2 · J1772 (Level 2) | ⚠ September 2024 |
⚠ 2 of Littleton's 47 stations haven't been re-confirmed by NREL in over 18 months and may be out of service — confirm in the network's app. Spotted something out of date or missing? Report a correction.
What this means
Level 2 is the standard public and home charger (240V) — a few hours for a full charge, fine for shopping, work, or overnight. DC fast charging is the highway kind: 20–40 minutes to most of a charge, but not every station has it.
Connectors are the plug shape. J1772 is the universal Level 2 plug almost every non-Tesla EV uses. CCS and CHAdeMO are DC fast-charging plugs (CHAdeMO is older, mostly older Nissan Leafs). NACS is Tesla's plug, now the emerging US standard — many newer non-Teslas use it or an adapter.
This page summarizes NREL's own station records and is not a live availability map — a charger listed here can still be busy, broken, or behind a gate. Check the network's app before you rely on a specific plug.
Charging at home in Littleton?
Most EV owners do the bulk of their charging overnight at home on a Level 2 charger. See our home EV charger buying guide for what to look for and how to match a charger to your car's connector.
EV charging near Littleton
Source: U.S. DOE / NREL Alternative Fuels Data Center (AFDC) Station Locator, retrieved July 2026. Public stations only.