ChargingAtlas

CT / Stamford

CT · EV charging

EV charging in Stamford, CT

Here is what NREL's public data shows about EV charging in Stamford, CT. As of NREL AFDC data retrieved July 2026, Stamford has 48 public charging stations with 243 Level 2 ports, including 48 DC fast-charging ports for quick top-ups.

DC fast   Level 2   not recently confirmed  ·  click a marker for details, directions & Street View

⚡ 5 stations list free charging

Stations are operated across 11 networks: ChargePoint Network (15), Non-networked (6), Blink Network (6), AMPUP (5), and 7 more.

Connectors on record: J1772 (Level 2) at 39 stations; NACS / Tesla at 6 stations; CCS (J1772 Combo) at 4 stations; CHAdeMO at 2 stations.

Of these stations, 5 list free charging and 3 are paid, per NREL's pricing field. Pricing is not recorded for the remaining 40. Always confirm current pricing with the network before you charge.

6 stations carry a NACS / Tesla connector — relevant if you drive a Tesla or a newer EV that has switched to NACS.

Notable charging stations

The largest sites by port count, DC fast first. Stamford has 48 public stations in all — see the map above.

StationNetworkChargingConfirmed
Stamford, CT - Greyrock Place - Tesla Supercharger
100 Greyrock Pl
Tesla DC fast 24 DC fast · NACS / Tesla June 2026
Stamford, CT - Tesla Supercharger
2233 Summer Street
Tesla DC fast 12 DC fast · NACS / Tesla June 2026
Ridgeway Shopping Center (Stamford, CT)
2233 Summer St
Electrify America DC fast 8 DC fast · CCS (J1772 Combo) July 2026
Minchin Buick of Stamford
131 Jefferson St
Blink Network DC fast 2 DC fast · CCS (J1772 Combo) July 2026
KIA MAIN KS CPE250 1
263 Selleck St
ChargePoint Network DC fast 1 DC fast · CHAdeMO, CCS (J1772 Combo) July 2026
KIA MAIN KS CPE250 2
263 Selleck St
ChargePoint Network DC fast 1 DC fast · CHAdeMO, CCS (J1772 Combo) July 2026
18 Dock St
18 Dock St
LOOP 46 Level 2 · J1772 (Level 2) July 2026
Stamford Parking Garage
57 S State St
AMPUP 38 Level 2 · J1772 (Level 2) ⚠ May 2024
RMS Companies
154 Broad St
AMPUP 10 Level 2 · J1772 (Level 2) August 2025
600 Washington
600 Washington Blvd
AMPUP 8 Level 2 · J1772 (Level 2) ⚠ May 2024

⚠ 13 of Stamford's 48 stations haven't been re-confirmed by NREL in over 18 months and may be out of service — confirm in the network's app. Spotted something out of date or missing? Report a correction.

What this means

Level 2 is the standard public and home charger (240V) — a few hours for a full charge, fine for shopping, work, or overnight. DC fast charging is the highway kind: 20–40 minutes to most of a charge, but not every station has it.

Connectors are the plug shape. J1772 is the universal Level 2 plug almost every non-Tesla EV uses. CCS and CHAdeMO are DC fast-charging plugs (CHAdeMO is older, mostly older Nissan Leafs). NACS is Tesla's plug, now the emerging US standard — many newer non-Teslas use it or an adapter.

This page summarizes NREL's own station records and is not a live availability map — a charger listed here can still be busy, broken, or behind a gate. Check the network's app before you rely on a specific plug.

Charging at home in Stamford?

Most EV owners do the bulk of their charging overnight at home on a Level 2 charger. See our home EV charger buying guide for what to look for and how to match a charger to your car's connector.

EV charging near Stamford

Source: U.S. DOE / NREL Alternative Fuels Data Center (AFDC) Station Locator, retrieved July 2026. Public stations only.