ChargingAtlas

FL / Wesley Chapel

FL · EV charging

EV charging in Wesley Chapel, FL

Here is what NREL's public data shows about EV charging in Wesley Chapel, FL. As of NREL AFDC data retrieved July 2026, Wesley Chapel has 20 public charging stations with 46 Level 2 ports, including 24 DC fast-charging ports for quick top-ups.

DC fast   Level 2   not recently confirmed  ·  click a marker for details, directions & Street View

Stations are operated across 7 networks: ChargePoint Network (8), FLO (5), Blink Network (3), eVgo Network (1), and 3 more.

Connectors on record: J1772 (Level 2) at 15 stations; CCS (J1772 Combo) at 5 stations; CHAdeMO at 2 stations; NACS / Tesla at 2 stations.

2 stations carry a NACS / Tesla connector — relevant if you drive a Tesla or a newer EV that has switched to NACS.

Notable charging stations

The largest sites by port count, DC fast first. Wesley Chapel has 20 public stations in all — see the map above.

StationNetworkChargingConfirmed
Tampa Premium Outlets MB.HPC
2647 Creek Grass Way
MERCEDES_BENZ DC fast 10 DC fast · CCS (J1772 Combo) July 2026
Wesley Chapel, FL Rechargery Relay @ Wawa - State Road 54
28225 State Road 54
IONNA DC fast 8 DC fast · CCS (J1772 Combo), NACS / Tesla July 2026
The Shops at Wiregrass
28211 Paseo Drive #100
eVgo Network DC fast 4 DC fast · CCS (J1772 Combo) July 2026
L394 STATION 1 DELIV
27000 Wesley Chapel Blvd
ChargePoint Network DC fast 1 DC fast · CHAdeMO, CCS (J1772 Combo) July 2026
L394 STATIOMN 4212
27000 Wesley Chapel Blvd
ChargePoint Network DC fast 1 DC fast · CHAdeMO, CCS (J1772 Combo) July 2026
Parc at Wesley Chapel
5561 Post Oak Boulevard
Blink Network 14 Level 2 · J1772 (Level 2) July 2026
SPOT X Hotel Tampa Bay - Tesla Destination
5703 Oakley Blvd
Tesla Destination 6 Level 2 · J1772 (Level 2), NACS / Tesla ⚠ July 2024
Sentosa Epperson building 9-10-11
7852 Tranquility Loop
FLO 3 Level 2 · J1772 (Level 2) July 2026
OS MANAGED WATERGRASS 3
32257 Snowberry Wy
ChargePoint Network 2 Level 2 · J1772 (Level 2) July 2026
STORYWC STATION 1
31155 Seaboard Cir
ChargePoint Network 2 Level 2 · J1772 (Level 2) July 2026

⚠ 1 of Wesley Chapel's 20 stations haven't been re-confirmed by NREL in over 18 months and may be out of service — confirm in the network's app. Spotted something out of date or missing? Report a correction.

What this means

Level 2 is the standard public and home charger (240V) — a few hours for a full charge, fine for shopping, work, or overnight. DC fast charging is the highway kind: 20–40 minutes to most of a charge, but not every station has it.

Connectors are the plug shape. J1772 is the universal Level 2 plug almost every non-Tesla EV uses. CCS and CHAdeMO are DC fast-charging plugs (CHAdeMO is older, mostly older Nissan Leafs). NACS is Tesla's plug, now the emerging US standard — many newer non-Teslas use it or an adapter.

This page summarizes NREL's own station records and is not a live availability map — a charger listed here can still be busy, broken, or behind a gate. Check the network's app before you rely on a specific plug.

Charging at home in Wesley Chapel?

Most EV owners do the bulk of their charging overnight at home on a Level 2 charger. See our home EV charger buying guide for what to look for and how to match a charger to your car's connector.

EV charging near Wesley Chapel

Source: U.S. DOE / NREL Alternative Fuels Data Center (AFDC) Station Locator, retrieved July 2026. Public stations only.