TX / Weatherford
TX · EV charging
EV charging in Weatherford, TX
Here is what NREL's public data shows about EV charging in Weatherford, TX. As of NREL AFDC data retrieved July 2026, Weatherford has 7 public charging stations with 5 Level 2 ports, including 7 DC fast-charging ports for quick top-ups.
DC fast Level 2 not recently confirmed · click a marker for details, directions & Street View
- 7Public stations
- 5Level 2 ports
- 7DC fast ports
- 58%Ports that are DC fast
⚡ 2 stations list free charging
Stations are operated across 5 networks: Non-networked (2), ChargePoint Network (2), Blink Network (1), EV Connect (1), and 1 more.
Connectors on record: CCS (J1772 Combo) at 4 stations; J1772 (Level 2) at 3 stations; CHAdeMO at 1 station.
Of these stations, 2 list free charging, per NREL's pricing field. Pricing is not recorded for the remaining 5. Always confirm current pricing with the network before you charge.
Notable charging stations
The largest sites by port count, DC fast first. Weatherford has 7 public stations in all — see the map above.
| Station | Network | Charging | Confirmed |
|---|---|---|---|
| Pilot Travel Center 206 1201 I-20 West | eVgo Network | DC fast 4 DC fast · CCS (J1772 Combo) | July 2026 |
| Jerry's Cadillac 3110 Fort Worth Hwy | EV Connect | DC fast 1 DC fast · CCS (J1772 Combo) | July 2026 |
| JERRYS HYUNDAI INVENTORY 3403 Fort Worth Hwy | ChargePoint Network | DC fast 1 DC fast · CHAdeMO, CCS (J1772 Combo) | July 2026 |
| GATEWAYS ABB STATION 1 3131 Fort Worth Hwy | ChargePoint Network | DC fast 1 DC fast · CCS (J1772 Combo) | July 2026 |
| Hampton Inn & Suites Dallas/Duncanville 202 E Interstate 20 | Blink Network | 2 Level 2 · J1772 (Level 2) | July 2026 |
| Jerry's Cadillac 3110 Fort Worth Hwy | Non-networked | 2 Level 2 · J1772 (Level 2) | July 2026 |
| Southwest Nissan 3050 Fort Worth Hwy | Non-networked | 1 Level 2 · J1772 (Level 2) | ⚠ February 2024 |
⚠ 1 of Weatherford's 7 stations haven't been re-confirmed by NREL in over 18 months and may be out of service — confirm in the network's app. Spotted something out of date or missing? Report a correction.
What this means
Level 2 is the standard public and home charger (240V) — a few hours for a full charge, fine for shopping, work, or overnight. DC fast charging is the highway kind: 20–40 minutes to most of a charge, but not every station has it.
Connectors are the plug shape. J1772 is the universal Level 2 plug almost every non-Tesla EV uses. CCS and CHAdeMO are DC fast-charging plugs (CHAdeMO is older, mostly older Nissan Leafs). NACS is Tesla's plug, now the emerging US standard — many newer non-Teslas use it or an adapter.
This page summarizes NREL's own station records and is not a live availability map — a charger listed here can still be busy, broken, or behind a gate. Check the network's app before you rely on a specific plug.
Charging at home in Weatherford?
Most EV owners do the bulk of their charging overnight at home on a Level 2 charger. See our home EV charger buying guide for what to look for and how to match a charger to your car's connector.
EV charging near Weatherford
Source: U.S. DOE / NREL Alternative Fuels Data Center (AFDC) Station Locator, retrieved July 2026. Public stations only.